001
A night-sky stage of drifting aurora curtains — four huge blurred, screen-blended radial blobs in teal, violet, magenta and cyan slowly folding into one another over a deep ink gradient — with a canvas of twinkling stars and the occasional shooting star behind them. Center stage floats a frosted glass card with a conic aurora edge-glow, a moving specular highlight, eyebrow badge, serif display headline with a gradient italic word, two buttons and a hairline stat row
Original prompt
"Aurora Glass". Frosted glassmorphism hero card floating over a slow-shifting aurora gradient (teal/violet/magenta). Animate gradient blobs with keyframes + blur; card uses backdrop-filter blur, subtle border, inner highlight; add faint grain. Interaction: card tilts/parallaxes with mouse movement; gentle idle float
001-aurora-glass.txt