GROUNDWORKS JOURNALPUBLIC WORKS / 05

Staircase for rain

At Quarry Steps, feet and water take the same way down the hill. They get a lane each.

01 / UPPER LANDING

Intake

Rain on the quarry road collects at a slot cut across the landing. At the low end, the slot passes through a sleeve and enters a channel behind the stair's right cheek.

The grate lifts from the uphill side. Someone has to reach the leaves in November.

02 / SIDE CHANNEL

Deflector

Every drop in the side channel ends against a flat shoulder. Water hits the shoulder, loses speed, and falls across the next tread. The handrail stays dry above it.

03 / LOWER LANDING

Basin

The last drop is a shallow spill into a gravel tray. It takes the grit out before the water reaches the planted verge. In a long storm the iris bed fills to the top of its stone lip.

010203 SECTION A–A / 1 : 50
01 / Slot at upper landing